Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The sequence for creating a new optical patch, seen from a documentation POI:

  • Consult DWDM planning drawing to find free slot in nodes
  • Consult channel planning sheet to find free channel
  • Onsite work: required patch cables are labeled according to "Michael/Bergroths rules"
    Patch ID's are put into editgrid, reference is made only to physical objects; port names, ODF, rack ID etc.

...

  • Obtain a new

...

  • Link ID for both ends (NU-1xxyyzzww)

...

make path in OMS

...

  • and document the links

How to

  • Obtain new Path ID and document the path
    How to
  • Obtain a new Service ID and document the service
    How to